When Luke from World Gyms reached out, he was building his newest facility in Tuggerah, NSW, and he had a familiar problem.
He was planning a new recovery area but was determined to avoid the issues from his other gyms: unreliable chillers that couldn't hold temperature and pumped way too much heat into the facility.
He'd seen our content and noticed people he knew were following us on Instagram, so he gave us a call.
Our first chat was pretty standard—pool size, desired temperature, the usual details.
The second call, however, was with his business partner who, to be honest, took some convincing.
As the owner of a well-known recovery centre on the Gold Coast and many other gyms, he'd been through the wringer with other systems.
He knew all about the frustrations of poor ventilation and complex pipe runs and was ready to not do that again.
What got his attention was our split-system design.
That, and the fact we backed it with a guarantee, which meant there was zero risk on his end.
They gave us the green light.
A couple of weeks later, the chiller was on-site and installed.
It hasn't missed a beat since.
The indoor unit is tucked away neatly under the stairs, and the outdoor unit is up on the roof where no one can see or hear it—solving their heat and noise problems in one go.
They were over the moon with the result.
The system just sits there doing its thing, holding the perfect temperature without any fuss.
That's exactly how we want it.
The World Gyms team was so happy that in the following months, they put more Bergs chillers and tubs into their other facilities.
This is the problem Bergs solves: a reliable, powerful system you don't have to think about, backed by a guarantee that takes all the risk off the table.
Talk to James
